In 2022, we prepared a 1,460-acre site for the development of a large-scale solar farm. The project involved 130,000 cubic yards of cut and fill to establish final grades, along with slope stabilization, construction of low water crossings, and installation of road culverts. This early-phase work laid the groundwork for solar infrastructure across varied terrain, ensuring durability, accessibility, and efficient site drainage for long-term energy production.