- office@tsjconstruction.com
- (435) 653-1910
- 870 East 300 North, Cleveland, UT 84518
Set across 3,500 acres, the Green River Energy Center is one of the region’s most expansive renewable energy site developments. The project includes over 1,300,000 cubic yards of cut and fill to prepare the terrain for future energy infrastructure. The large-scale grading operation is engineered to optimize drainage, stability, and accessibility—laying the groundwork for long-term, utility-scale power generation.
View the press releases here: