- office@tsjconstruction.com
- (435) 653-1910
- 870 East 300 North, Cleveland, UT 84518
Completed in 2023, this project focused on protecting the county road adjacent to the Millsite Reservoir by reinforcing the shoreline. The work involved excavation along the reservoir bank and strategic placement of harvested rip rap to stabilize the slope and prevent erosion. The protection measures were designed to preserve road integrity, enhance safety, and support long-term durability in a sensitive, high-traffic area.