- office@tsjconstruction.com
- (435) 653-1910
- 870 East 300 North, Cleveland, UT 84518
This project involved the repair of a primary storm drainage line, addressing aging infrastructure to restore effective water management on site. The work required excavation, pipe replacement, and reconnection within an active industrial environment, with careful planning to minimize disruption to plant operations. The upgraded system ensures continued site protection from stormwater runoff and supports the long-term functionality of critical utility infrastructure.