Construction of 10,650 sq. ft. research facility near Orangeville, UT. 2024
Excavate around reservoir bank along the county road and line with harvested rip rap near Ferron, UT 2023.
Site work and erection of Snow Removal Equipment building for Canyonlands Regional Airport in Moab, UT 2023.
Site work and erection of Snow Removal Equipment building for Canyonlands Regional Airport in Moab, UT 2023.
1,460 acres, 127,380 CY of cut and fill, with slope stabilization, low water crossings, and road culverts in preparation for large solar farm near Cedar City, UT. 2022.
37,500 CY of excavation, 29,500 CY of embankment, plus rip rap concrete weir, outlet structure, piezometers, piping, and valves for irrigation pond near Emery, UT. 2022.
Installed 22,800 LF irrigation line with headwall structure, service connections, valves, vaults, and lids near Orangeville, UT. 2022.
Construction of 28,000 sq. ft. office and manufacturing facility in Cleveland, UT. 2022.
Removed existing parking lot and field for new parking lot and bus loop, fencing, and drainage in Price, UT. 2021.
Relocated road and drainage, runway threshold and signage for airport expansion near Moab, UT. 2021.
Prepared site for 600 acre, 104MWdc solar farm in Wellington, UT. 2021.
Construction of large, multicell sewer lagoons for the town of Tropic, UT. 2021.
Highlights from the Millsite Road Protection project. Notice rip rap production, excavator hammering, trucking, and rip rap placement.